Company
Markets
Projects
Careers
Contact
Company
Markets
Projects
Careers
Contact
Projects
Our Projects
Selsse Creek Forest Service Road
Earthwork
/
Environmentally-Sensitive Work
/
Marine
Ladner Dredge Cell
Marine
Rd. 1 Repairs
Marine
Concrete Float Connection
Marine
Construct New Office and Work Spaces
Finishes
/
Fire Suppression
/
Openings
/
Thermal & Moisture Protection
/
Wood + Plastics + Composites
French Creek Fish Plant Piles
Marine
Salish Orca Life Raft Exchange
Marine
French Creek Harbour
Marine
Install Ladders at Steveston
Marine
Supply and Installation of TAPV Shelters
Mechanical
Prophet River Salt Shed Replacement
Earthwork
/
Electrical
/
Environmentally-Sensitive Work
/
Existing Conditions: Demolition
/
Metals
/
Special Construction
VCC Indigenous Art Walkway
Exterior Improvements
Concrete Float Modules
Marine
/
Mechanical
/
Metals
Quick Bridge Superstructure Replacement
Environmentally-Sensitive Work
/
Marine
/
Metals
Beaver Management Activities
Earthwork
/
Environmentally-Sensitive Work
/
Exterior Improvements
Kamloops Airport
Marine
Dockyard Building 70 Retaining Wall
Concrete
/
Earthwork
/
Exterior Improvements
/
Metals
/
Utilities
Emergency Log Removal
Marine
Colwood Tank Farm
Exterior Improvements
/
Finishes
/
Plumbing
Pier 407
Marine
No. 1 Rd (Wharf 409)
Marine
Boom Piles
Marine
Crane Relocation
Marine
Vancouver Yacht Club – Jericho Beach
Marine
Gangway Repairs
Marine
Building 38/39
Concrete
/
Marine
2-3 Pile Dolphins
Marine
Vancouver Yacht Club – Stanley Park
Marine
24 Timber Piles & 24 Timber Chocks – Steveston Harbour
Marine
No. 3 Rd. Richmond
Marine
Barnstone Island Ferry Terminal
Marine
Cableway Decomissioning Beaver River
Existing Conditions: Demolition
Nation River Cableway
Existing Conditions: Demolition
Horseshoe Bay Rock Face Remediation
Earthwork
/
Featured
Glass Walkway Replacement
Concrete
Remediation Specifications – Mary Hill – Former Rifle Range Area
Earthwork
/
Existing Conditions: Demolition
Snootli Creek Hatchery – Aeration facility
Concrete
/
Earthwork
/
Metals
/
Utilities
Wuikinuxv Wharf Reconstruction
Environmentally-Sensitive Work
/
Marine
Construct ISSC Partner Concrete Pad
Concrete
/
Earthwork
/
Existing Conditions: Demolition
Kwisitis Visitors Centre Interior Renovations – Phase 2
Concrete
/
Electrical
/
Finishes
/
Fire Suppression
/
HVAC
/
Plumbing
/
Thermal & Moisture Protection
/
Wood + Plastics + Composites
Replace Grease Traps CFB Esquimalt
Concrete
/
Earthwork
/
Exterior Improvements
/
Metals
/
Plumbing
/
Thermal & Moisture Protection
/
Utilities
Rock Slope Stabilization
Earthwork
Granville Bridge Abutment Repairs
Concrete
/
Metals
Wildwood Bridge – Seismic Retrofit and Condition Renewal
Concrete
/
Exterior Improvements
Ladner Creek Trestle Fence Repairs
Specialties
Atnarko Generator Building
Electrical
/
Thermal & Moisture Protection
Bridgeway Slope Rehabilitation
Exterior Improvements
Deconstruct Dockyard Turntable
Exterior Improvements
Memorial Walkway
Exterior Improvements
TAPV Shelters Utilities Connections
Electrical
/
Mechanical
LED Crosswalk Signals
Exterior Improvements
/
Specialty
Lock Upgrade and Door Replacement
Openings
2021 Bridge Rehabilitation
Concrete
/
Metals
Aldergrove WTP Tank Replacement
Existing Conditions: Demolition
/
Metals
/
Water & Wastewater Equipment
Demoltion of Existing Slab and Re-paving Fraser Port of Entry
Existing Conditions: Demolition
/
Exterior Improvements
B3 Patio and BBQ Shelter
Concrete
/
Earthwork
/
Existing Conditions: Demolition
/
Mechanical
/
Thermal & Moisture Protection
Three Foundation Modifications
Concrete
/
Earthwork
/
Environmentally-Sensitive Work
/
Featured
/
Finishes
16 Avenue – 2440 Block Culvert Upgrade
Earthwork
/
Existing Conditions: Demolition
/
Metals
B224 Roof & Central Heating Replacement
Electrical
/
Existing Conditions: Demolition
/
Finishes
/
Openings
/
Thermal & Moisture Protection
Fabricate and Install New Metal Stairs
Concrete
/
Existing Conditions: Demolition
/
Metals
Barracks B24 and B25 Renovations
Concrete
/
Electrical
/
Mechanical
/
Metals
New Westminster Pier Park Access
Exterior Improvements
Replacement of Existing SS Tower at Naden for the Communication Towers Program
Existing Conditions: Demolition
/
Special Construction
Repair of View Deck – Bedford Landing
Marine
Secondary Roads Brushing
Exterior Improvements
CBSA Aldergrove Crossing Canopy Assessment and Repair
Concrete
/
Electrical
/
Exterior Improvements
Rappel Tower Construction
Concrete
/
Earthwork
Mount Ozzard Bypass Road and Tower Foundation
Concrete
/
Environmentally-Sensitive Work
/
Exterior Improvements
Beaver Lake Environmental Enhancement
Concrete
/
Environmentally-Sensitive Work
/
Existing Conditions: Demolition
/
Metals
/
Utilities
Kwisitis Visitors Centre Renovation Phase 1
Concrete
/
Finishes
/
Mechanical
/
Metals
/
Openings
/
Plumbing
/
Thermal & Moisture Protection
/
Wood + Plastics + Composites
Crabapple Sewer Lift Station S103 Upgrade Project
Earthwork
/
Electrical
Davidson Ave. Sewer Repair
Concrete
/
Earthwork
Cochrane Riverfront Park Bridge Replacement
Earthwork
/
Exterior Improvements
/
Metals
Bull Moose Creek Concrete Rehabilitation
Concrete
/
Environmentally-Sensitive Work
/
Existing Conditions: Demolition
/
Featured
Salt River Day Use Kitchen Shelter
Concrete
/
Electrical
/
Finishes
/
Mechanical
/
Openings
/
Thermal & Moisture Protection
Lardeau River at Marblehead Cable Replacement
Environmentally-Sensitive Work
/
Exterior Improvements
Anson Road Dock On-Shore Construction
Earthwork
/
Featured
Access Upgrade in Return Air Shaft
HVAC
/
Metals
North Victoria Drive Sewer Outfall Structure Upgrades
Metals
Uyarsivik Lake Basecamp Improvement
Plumbing
/
Wood + Plastics + Composites
Install Perimeter Fencing – Richmond Training Area
Exterior Improvements
Pepin Creek Culvert Rehabilitation
Earthwork
/
Exterior Improvements
Hartley Bay Search and Rescue Station
Finishes
/
Mechanical
/
Metals
/
Openings
/
Specialties
/
Thermal & Moisture Protection
/
Wood + Plastics + Composites
Ladner Creek Trestle Security Fence Construction
Earthwork
/
Exterior Improvements
Vermillion Crossing Privy Replacement
Concrete
/
Environmentally-Sensitive Work
/
Existing Conditions: Demolition
/
Thermal & Moisture Protection
Belmont Park New Storm Drain
Concrete
/
Exterior Improvements
Anderson Creek Bridge
Concrete
/
Environmentally-Sensitive Work
/
Existing Conditions: Demolition
Waterton Helipad and Fueling Station
Concrete
/
Earthwork
/
Electrical
/
Environmentally-Sensitive Work
/
Exterior Improvements
Esquimalt Offer
Metals
Water Ingress at Section One Stairwell
Concrete
/
Environmentally-Sensitive Work
/
Existing Conditions: Demolition
SPWWTP Supply and Delivery of Removable Tank Access Stairs
Concrete
/
Metals
Warehouse Construction at the Currie BLDG
Concrete
/
Earthwork
/
Electrical
/
Metals
Hjorth Creek Pedestrian Bridge
Earthwork
/
Environmentally-Sensitive Work
/
Exterior Improvements
Bike Storage Facility & Art Installation
Existing Conditions: Demolition
/
Metals
Residential Pathway & Lighting Upgrades
Earthwork
/
Electrical
Nanaimo Guardrail
Concrete
/
Earthwork
Whistler MSA 1
Concrete
/
Earthwork
/
HVAC
/
Plumbing
Campbell River ATB Steel Stairs, Landings & Deck Platforms
Existing Conditions: Demolition
/
Furnishings
/
Metals
West Vancouver Drainage Improvements
Concrete
/
Earthwork
/
Marine
/
Metals
Sound Wall
Earthwork
/
Exterior Improvements
Load More
Search Projects
Search by Location
Alberta
(5)
Cariboo
(1)
Coastal Vancouver
(20)
Feature
(5)
Kootenay
(2)
Manitoba
(1)
Nechako
(4)
Northeast
(1)
Northwest Territories
(2)
Saskatchewan
(1)
Thompson-Okanagan
(4)
Vancouver Island
(22)
Vancouver Mainland
(14)
Yukon
(1)
Search by Project Scope
Concrete
(25)
Earthwork
(21)
Electrical
(8)
Environmentally-Sensitive Work
(13)
Existing Conditions: Demolition
(15)
Exterior Improvements
(19)
Finishes
(4)
Fire Suppression
(2)
Furnishings
(1)
HVAC
(2)
Marine
(23)
Mechanical
(5)
Metals
(17)
Openings
(2)
Plumbing
(5)
Special Construction
(2)
Specialties
(1)
Specialty
(1)
Thermal & Moisture Protection
(7)
Utilities
(4)
Water & Wastewater Equipment
(1)
Wood + Plastics + Composites
(5)