CFB Esquimalt, Victoria, BC
The project involved demolition of existing concrete/asphalt area and retaining wall. Site works for preparation of site for concrete slab lay down area and concrete slab. Work further included the construction of a concrete block retaining wall and electrical service from existing power pole for construction trailers.