Surrey, BC
The Anderson Creek Bridge Replacement project included removal and disposal of the existing timber bridge and timber piles; earthworks and installation of riprap; supply and installation of 10 – 610 steel pipe piles; construction of two cast-in-place concrete abutments and wingwalls; supply and installation of precast concrete girders; construction of cast-in-place concrete deck overlay and concrete parapets; installation of bicycle railings; grading and paving of two 40-meter long approach roadways, and landscaping and site restoration.