Storm Pipe Connection New Westminster Armoury

New Westminster, BC

Project Info

PFM Construction completed a storm infrastructure upgrade at the New Westminster Armoury, delivering a reliable connection to the existing storm system. The project required precise excavation and tie-in work within a constrained site while maintaining operational access. Our team ensured efficient execution and compliance with municipal standards.

Scope of Work

  • Site mobilization and setup
  • Excavation to expose existing storm infrastructure
  • Installation of new storm pipe connection
  • Tie-in to existing system
  • Backfill and compaction
  • Site restoration and demobilization
  • CONTRACT VALUE$150,000
  • CLIENT
  • CONSULTANTEast Point Engineering LTD
  • TIMELINENovember 2023-December 2023